15 / Hitoyoshi City, Kumamoto Prefecture / High-purity MgO, farming, animal welfare

The land's next role,through industry and farming.

Farm use of a completed landfill site, with five MgO units housed in a building the same size as Kota Town's. Solar panels on the roofs of the surrounding large greenhouses will combine farming with resource recycling.

  • Industry
  • Production

HITOYOSHIHitoyoshi City, Kumamoto Prefecture

Concept image of an MgO plant building and large greenhouses with rooftop solar panels on flat land surrounded by mountains
Concept image of a five-unit MgO plant building the same size as Kota Town's, with large greenhouses topped with solar panels.

approx.20,000tsubo

A plan to use the completed landfill mainly for farming.

5units

MgO plants housed in a building the same size as Kota Town's.

About 20,000 tsubo

A plan to use the completed landfill mainly for farming.

Five MgO units in one building

Five units housed in a building the same size as Kota Town's.

Solar panels on greenhouse roofs

Solar panels on the roofs of the surrounding large greenhouses.

15 / Hitoyoshi City, Kumamoto Prefecture / Business plan

How the project works and next steps

Current stage

Negotiating the land sale; awaiting the authorities' decision

  1. 01

    Land and parties

    Location: 4123 Suzuno, Okobafumoto-machi, Hitoyoshi City. The landowner is FM Clean Co., Ltd., whose representative director is Mr. Toshihiro Morii.

  2. 02

    Land use

    About 20,000 tsubo of completed landfill will be used mainly for farming, with the plant placed on firm ground nearby.

  3. 03

    Manufacturing and growing facilities

    Five units will be housed in an MgO plant building the same size as Kota Town's, surrounded by large greenhouses with rooftop solar panels.

  4. 04

    Farming, biochar and power

    We will introduce moringa cultivation and a biochar system and combine them with solar power on the greenhouse roofs to plan a carbon credit business.

  5. 05

    Rescue dog facility

    In addition to farming and the plant, a rescue dog facility is being considered. Layout, number of dogs, operator and costs will be decided later.

  6. 06

    Ownership and leadership

    The owner is Toyo Energy Farm. Mr. Morii also serves as its adviser and is planning the use of the site.

Current progress

Landfilling and management of the final disposal site have ended, and a completion notice has been filed with Hitoyoshi City. We are now awaiting the authorities' decision. Alongside the land sale negotiations, we are planning a project to use the roughly 20,000-tsubo site.

Approach to revenue and costs

Sales of MgO products and farm produce are estimated separately. The investment amount will be set after checking ground conditions, zone boundaries, conditions for farm use, water supply and drainage, and the layout.

Items to study and confirm

  • Land registry records
  • Ground and boundaries
  • Conditions for farm use
  • Equipment layout
  • Rescue dog operations
  • Carbonization and certification

Growing methods, equipment and investment have not been finalized. The image is not a photo of the current Hitoyoshi site.

Source: Hybrid Plant Business Investment LLP, "Comprehensive Business Plan for 15 Locations" (5th draft, as of October 12, 2026). Plans and timing may change through future consultations and procedures.