08 / Kota Town, Aichi / High-purity MgO, welfare, farming

From high-purity MgO productioninto local industry and daily life.

Five indoor MgO plants and a nursing home are planned, linking manufacturing, welfare and farming.

  • Industry
  • Life

KOTAKota Town, Aichi

Concept image of an indoor MgO plant and solar power facility surrounded by forest
Concept image | Five MgO plants are planned.

99.99%

Target purity

5units

Indoor plants planned

6m → 8m

Access road widening plan

Five indoor plants

High-purity MgO production, targeting 99.99% purity.

Nursing home

Planned with Sakurakai as operator.

Resource recycling

Moringa cultivation, biochar and carbon credits planned.

08 / Kota Town, Aichi / Business plan

How the project works and next steps

Current stage

Reviewing a lease agreement with a purchase option

  1. 01

    Production equipment

    Five indoor MgO plants are planned, with production and quality control systems.

  2. 02

    Product and energy

    Targeting 99.99% purity, we envision using renewable energy, including solar.

  3. 03

    Surrounding works

    The access road will be widened from about 6 m to about 8 m, with safety measures at the entrance.

  4. 04

    Welfare business

    Sakurakai will run the nursing home. We will confirm facility conditions, beds, how it will be taken over and the start date.

  5. 05

    Farming and biochar

    We plan to introduce moringa cultivation and a system that turns biomass into biochar, and to run a carbon credit business.

  6. 06

    Operating divisions

    Responsibility, investment and finances for the manufacturing and care businesses will be clarified and planned separately.

Current progress

We have asked the legal adviser of the landowner, Fu-chan Net Co., Ltd., to prepare a lease agreement with a purchase option, which is under review. The contract is yet to be signed.

Approach to revenue and costs

Income from product sales and from care services is kept separate and estimated after confirming production capacity, sales terms, staffing and facility costs. Carbonization and certification requirements will also be defined.

Items to study and confirm

  • Plant specifications
  • Project costs and quotes
  • Product sales terms
  • Road and land conditions
  • Nursing home facility conditions

Buildings, equipment and layout are concept images. The carbon credit business will proceed after checking the scheme and methodology.